BC3 Solutions was engaged by Maincon Building Pte Ltd to carry out sealant cladding, sealant removal, and façade cleaning on 14th September 2017. The areas / location of works covered is noted below as per contractual basis:
– External cleaning utilizing Rope Access for Elevation #2 and #3
– Sealant and Maintenance Works using Rope Access

BC3 Solutions and Maincon Building Pte Ltd have partnered up to provide a breakdown in the tender exercise, including the location of works for affected areas and the details of the specific locations to be cleaned and sealant.

BC3 Solutions was provided with the work schedules for work areas to be carried out in conjunction with Workplace Safety and Health. We have completed the site inspection for both buildings and worksites. Pre-work documents were submitted on time, acknowledging the general requirement and workmanship.

Summary

BC3 Solutions has completed the work scope as requested by MCST 1673 in fulfilling the contract terms virtually and in a safe timed manner without compromising on the standards and adhering to the client requirements and procedures.

A total of 9 days was spent to completion for the building areas utilizing our group of qualified and experienced rope access technicians.

Below detail, the photos during façade cleaning and inspection works. We have met with the Client requirement, and all involved were informed of our progress from start to end of the cleaning contract.